Wash -N- Dry Timeline - 5311 50th Street | ||
Date | Site Photos | Details |
Before - looking East | ||
Before - looking NW | ||
|
||
Site Grading - SW | ||
Site Grading - NW | ||
|
||
Footing Work - SW | ||
Footing Work - NW | ||
|
||
Ready to pour footing - SW | Corner Column Anchor Bolts | |
Ready to pour footing - NW | North Mid Column Anchor Bolts | |
East Foundation Footing | ||
North Foundation Footing | ||
Sewer Line Installation | ||
Coming Soon Sign | ||
|
||
Plumbing Rough-in - SW | Plumbing Rough-in #1 | |
Plumbing Rough-in - NW | Plumbing Rough-in #2 | |
|
||
Slab, Drive, and Curb Poured - SW | Slab Poured | |
Slab, Drive, and Curb Poured - NW | Curb Poured | |
|
||
Steel Arrives - SW | Lint and Sand Trap Detail | |
Steel Arrives - NW | Butler Steel Truck Arrives | |
Utility Trench | ||
Plumbing Trough | ||
|
||
Steel Erected - SW | Steel - South Wall | |
Steel Erected - NW | Steel - "X" Bracing Int. West Wall | |
Steel - Corner Detail | ||
Plumbing Trough Angle Iron | ||
|
||
Stud Framing Starts - SW | South Wall Steel Framing | |
Stud Framing Starts - NW | South Drive Before Concrete | |
Water Mains | ||
|
||
Special Framing - SW | Locating I-Beam for Suspended Wall #1 | |
Special Framing - NW | Locating I-Beam for Suspended Wall #2 | |
|
||
Roof and Sheathing Begin - SW | CMU Veneer Arrives | |
Roof and Sheathing Begin - NW | South Drive Forming | |
Interior Roof Insulation | ||
North Parapet Wall | ||
South Wall Sheathing | ||
West Wall Framing | ||
|
||
Roof almost finished - SW | West Wall Framing | |
Roof almost finished - NW | South Drive Poured | |
Overall Roof | ||
Roof Splices | ||
Roof Parapet | ||
Roof Flashing | ||
|
||
Started CMU Veneer - SW | CMU veneer corner detail | |
Started CMU Veneer - NW | CMU veneer window opening detail | |
|
||
CMU Veneer - SW | CMU veneer leave-out for vent | |
CMU Veneer - NW | CMU veneer - north wall | |
Stud framing #1 | ||
Stud framing #2 | ||
Stud framing #3 | ||
X-bracing modification | ||
Starting rack plumbing | ||
Rack framing | ||
|
||
CMU Veneer 1/4 done - SW | Packing trenches | |
CMU Veneer 1/4 done - NW | CMU veneer SW corner | |
Rack plumbing | ||
Parapet wall | ||
Parapet corner detail | ||
|
||
CMU Veneer 1/2 done - SW | Interior framing | |
CMU Veneer 1/2 done - NW | Plumbing wall | |
|
||
CMU Veneer 3/4 done - SW | Air Conditioning Units installed | |
CMU Veneer 3/4 done - NW | Drywall starts on West wall | |
Security mesh installed | ||
Drywall solution for X-bracing | ||
Water Tank installation | ||
Water Tank and Boiler installed | ||
Window frames installation | ||
CMU veneer on West wall | ||
|
||
Installing Windows - SW | Glass installed | |
Installing Windows - NW | Drywall continues | |
New electrical service | ||
|
||
Pole Sign installed & more site work - SW | Filling trenches | |
Pole Sign installed & more site work - NW | Forming building sidewalks | |
Forming south sidewalks | ||
New Pole sign & north sidewalks | ||
Rear CMU veneer wall finished | ||
Rear parapet CMU veneer | ||
Drywall tape & bed | ||
|
||
Property line curb - SW | HC accessible route | |
Property line curb - NW | Sliding door installed | |
Troweling property line curb | ||
Condenser units installed | ||
Bathroom tile installed | ||
|
||
Equipment arrives - SW | Light poles poured | |
Equipment arrives - NW | Getting ready for paint | |
Ducts arrive | ||
Entry doors installed | ||
Racks placed | ||
Rear concrete | ||
|
||
Painting - SW | Ceiling fans hung | |
Painting - NW | Plumbing fixtures installed | |
Stack dryers installed | ||
Duct work installed & Doors painted | ||
|
||
Getting ready for paving and landscaping - SW | Duct work for stack dryers #1 | |
Getting ready for paving and landscaping - NW | Duct work for stack dryers #2 | |
Duct work for stack dryers #3 | ||
Duct work for stack dryers #4 | ||
Interior view of equipment | ||
VTM & Soap machines installed | ||
|
||
Paving and landscaping - SW | Paving on South side parking lot | |
Paving and landscaping - NW | Landscaping on North side | |
Tile work in main area | ||
Laying tile | ||
|
||
Paving and landscaping completed - SW | Bill changer and tile base installed | |
Paving and landscaping completed - NW | Cap trim installed | |
West wall painted | ||
CMU flower bed started | ||
|
||
Striping and Canopy - SW | More washers arrive | |
Striping and Canopy - NW | Folding tables | |
|
East Canopy and Handicap Striping | |
Fire dampered ducts installed | ||
Duct Screen installed | ||
Stainless trim installed | ||
Stainless racks installed | ||
|
||
Cleanup - SW | Electrician's Ashtray | |
Cleanup - NW | Address signage | |
|
Dryer Ductwork with lighting | |
|
||
Finished - SW | Exterior View #1 | |
Finished - NW | Exterior View #2 | |
|
Interior View #1 - Stack Dryers | |
Interior View #2 - Washers | ||
Interior View #3 - Vending | ||
Interior View #4 - Washers | ||